This 0.74 km long, meter-gauge line was opened in 1903; it uses one vehicle and makes a change in altitude of 0.35 km, speed is 5 meters per second and the trip duration is 4 minutes. It connects to the CFF/SBB on the line from Bienne to La Chaux-de-Fonds.
Official site
No comments:
Post a Comment