Saturday, September 14, 2024

on the Transandino electrified summit section railway, Chile




One of the three rack-fitted 1-C-C-1 electric locomotives, number 101, built by SLM (3069/1925) with electrical gear supplied by Brown Boveri, working a ballast train at Los Andes in September 1990. (Richard Pelham pic)


No comments:

Post a Comment